This small bathroom renovation represents a complete transformation of an outdated bathroom space into a modern, functional bathroom that maximizes space efficiency. The project, completed over 4 weeks, demonstrates how careful planning, accurate cost estimation, and skilled execution can dramatically improve both the functionality and value of a home, even in compact spaces.
The homeowners came to us with a vision for a modern, space-efficient bathroom that would serve as a practical and stylish retreat. The design was carefully planned with a modern aesthetic in mind, featuring ABI Interiors fixtures in a brushed brass gold finish paired with white tone tiles to create a sophisticated and contemporary look. Through our detailed estimate process, we identified the scope of work needed: complete demolition of existing fixtures, comprehensive waterproofing, updated plumbing systems, professional tiling, and complete fit-off with modern fixtures. The estimated cost range of $15K–$22K reflects labour costs only. Fixtures, tiles, shower screen, and other materials are not included in this estimate.
What makes this project particularly noteworthy is the attention to detail at every stage, especially in maximizing the use of limited space. From the initial demolition that carefully preserved structural integrity, to the comprehensive waterproofing that ensures long-term protection, to the precision tiling work and final fit-off. Each phase was executed with professional expertise. We'll walk you through each stage of the process, showing you exactly what happened, when it happened, and how the costs were allocated.
Demo
1–2 days

The demolition phase began with careful removal of all existing bathroom fixtures, including old vanity, bathtub, shower fittings, and tiles. The renovator's team systematically stripped out outdated plumbing connections, ensuring all services were properly isolated and capped for safety. This process exposed the underlying wall and floor structures, allowing for thorough inspection to identify any hidden issues such as water damage or structural concerns. All materials were disposed of responsibly.
Waterproofing
2–3 days
Waterproofing is critical for bathroom renovations to prevent water damage. The renovator applied a comprehensive waterproofing membrane to all wet areas, including the shower area, bathtub area, floor, and around the vanity. The membrane was carefully installed with proper overlaps and sealed at all joints and penetrations. This waterproof barrier ensures long-term protection against moisture, preventing leaks and structural damage. The waterproofing was tested to ensure complete coverage and effectiveness before proceeding to the next stage.
Plumbing & Electrical
2–3 days

The plumbing and electrical stage involved installing new water supply lines and drainage systems for the shower, vanity, and bathtub. The renovator repositioned plumbing connections to accommodate the new layout, ensuring optimal placement for all fixtures. All pipes were properly secured and tested for leaks. The plumbing work was completed with precision, ensuring proper water pressure and efficient drainage. This stage also included rough-in work for the built-in bathtub, creating a clean and modern look. Electrical work was completed by an electrician, including repositioning GPOs (General Purpose Outlets) and preparing electrical connections for the mirror with integrated indirect lighting, ensuring all electrical services were properly positioned and ready for the fit-off stage.
Tiling
5–7 days

The tiling stage transformed the bathroom with beautiful floor and wall tiles. The renovator installed 600x600mm floor tiles with careful attention to leveling and alignment, creating a seamless surface. The subway tiles were installed with precision, ensuring consistent grout lines and perfect alignment around corners and fixtures. Each tile was carefully positioned using proper tile adhesive, and after installation, the renovator grouted the joints and sealed all edges to ensure durability and easy maintenance. The tiling work created a stunning, professional finish that serves as both a functional surface and a design feature.
Fit-off
2–3 days

The final stage involved comprehensive fixture installation and complete fit-off. The renovator installed the single vanity with counter top, ensuring proper alignment and secure mounting. A semi-frame shower screen in brushed brass gold finish matching the other ABI Interiors fixtures was installed to prevent water splash, creating a modern and cohesive aesthetic. The wall-mounted spout and mixer were fitted, completing the shower installation. The built-in bathtub was fitted, and all fixtures were connected to the plumbing systems that had been installed earlier. Everything was thoroughly tested to ensure proper functionality. The fit-off process included installing all final details, such as towel rails, and ensuring all services were properly connected and functioning. This comprehensive stage brought the entire renovation together, transforming the space into a fully functional, modern bathroom.



Transformation Summary
This small bathroom renovation represents a complete transformation from an outdated, inefficient bathroom space into a modern, functional bathroom that maximizes space efficiency. The 4-week project involved comprehensive demolition of all existing fixtures, including old vanity, bathtub, and shower fittings, creating a clean slate for the new design. The installation of comprehensive waterproofing ensures long-term protection against moisture, preventing leaks and structural damage.
The new plumbing systems were installed with precision, repositioning connections to accommodate the modern layout and maximize the use of limited space. The built-in bathtub creates a clean and contemporary look, while the new water supply lines and drainage systems ensure optimal functionality. The professional tiling work with white tone 600x600mm floor tiles and subway wall tiles creates a stunning, seamless finish that serves as both a functional surface and a design feature, making the space feel larger and more open.
One of the standout features of this renovation is the carefully curated fixture selection from ABI Interiors, featuring brushed brass gold finishes throughout. The single vanity with counter top provides both style and functionality while taking up minimal space, while the semi-frame shower screen in matching gold finish prevents water splash and creates a cohesive, modern aesthetic that makes the bathroom appear larger. The wall-mounted spout and mixer were fitted, completing the shower installation. The built-in bathtub was fitted, and all fixtures were carefully installed and connected to the plumbing systems, ensuring everything functions perfectly. The comprehensive fit-off process included installing all final details, such as towel rails, and thorough testing to ensure optimal performance.
The final result is a modern, functional bathroom that successfully combines style with practicality, even in a compact space. The thoughtful design choices, quality materials, and professional execution have created a space that not only improves daily living but also significantly increases the home's value. This renovation demonstrates how a well-planned project, executed by skilled professionals, can transform even a small space beyond expectations.
Project Cost Breakdown
Total Project Cost
Project Details
Materials & Specifications
About the Renovator
Lucas Tiling & Reno
✓ VerifiedSpecialised in Bathroom renovations with a focus on quality craftsmanship and attention to detail.